Swimming Pool To Cinema Room Conversion - Cannock

Cellar Conversion, Basement Conversion, Cellar, Basement, Swimming Pool, Refurbishment, Membrane, Cavity Drain Membrane

Working in conjunction with a Main Contractor SRS were appointed to carry out membrane and pump works in the conversion of a swimming pool to a cinema room. 

Prior to SRS commencing their works, the main contractor drained the swimming pool and removed the tiles, SRS then installed wall and floor membrane alongside perimeter drainage which ran to a pre-built sump where pumps were installed. 

SRS also installed timber battens for the use by the main contractor to fix supporting frame work to alongside installing insulation on the floor slab prior to the main contractor laying a screed floor. 

 

Works: Swimming Pool To Cinema Room Conversion.

Location: Cannock.

Client: Commercial Client.

Date: March 2016.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Floor and wall membrane installed and battens installed for Main Contractor.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Area prior to floor membrane being laid with wall membrane, insulation and timber battens.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Floor and wall membrane installed and battens installed for Main Contractor.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Area prior to floor membrane being laid with wall membrane, insulation and timber battens.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Area prior to floor membrane being laid with wall membrane, insulation and timber battens.

Swimming Pool To Cinema, Cannock.
Swimming Pool To Cinema, Cannock.

Area prior to floor membrane being laid with wall membrane, insulation and timber battens.